US-based Alpha Omega Shelving has completed the installation of a new Gorbel workstation crane system at a site in Mount Pleasant, Pennsylvania (PA).

The updated material handling system features a layout that enables multiple bridges to run along a shared runway, supporting several operators to lift and transport loads in the same workspace concurrently.

Each bridge is designed to travel the entire length of the runway, allowing for full coverage across the work area rather than being confined to a single spot.

The Gorbel workstation cranes use an enclosed track constructed to support smooth and controlled manual movement, enabling operators to position heavy components by hand with less exertion.

This setup is intended to add flexibility in the movement of materials, adapting to the daily operational patterns on the shop floor and minimising operator strain.

Workstation cranes produced by Gorbel are described as providing a solid structural base suited to advanced lifting operations.

The enclosed track system used in Gorbel workstation cranes is designed to combine strength with reduced weight, enabling easier manoeuvrability and intended to ensure long operational life.

The installation aims to allow the facility to improve efficiency in material handling by enabling shared crane operation and simultaneous use by multiple personnel.

Alpha Omega Shelving, the company responsible for the installation, has been involved in supplying material handling, storage, and industrial solutions for over 40 years.

Its services extend from initial warehouse design and workflow planning to installation of pallet racking, facility automation, and bespoke material handling setups.

The company states that each project is managed from planning to installation, providing tailored solutions in accordance with operational requirements and safety standards.

Alpha Omega Shelving’s client base includes businesses in warehousing, manufacturing, distribution, retail, and industrial sectors.

The company positions itself as offering solutions aimed at maximising space usage, streamlining workflow, and supporting productivity within industrial environments.

In July 2026, Wolter installed a Gorbel bridge crane at a client’s facility located in the Southeast region of the US.