Uesco Cranes
Yale hoists are employed in the facility
-
The building housing the new cranes dates back to the 1900s. -
The double-girder crane. -
One challenge was to design a monorail loop. -
One challenge was to design a monorail loop. -
Yale hoists are employed in the facility -
The building has both low and high ceilings. -
The whole project took about 18 to 19 months – from initial discussions to...